Manage Your Project Through the Model

Manage your project more efficiently and with greater control by bringing together 3D models, quantity takeoffs, costs, on-site progress, and schedules on a single platform.

Manage Your Project Through the Model
Home / Solutions / BIM Management

Put BIM Data at the Heart of Project Management

Integrate model, quantity takeoff, cost, schedule, and site data to manage project processes using unified, up-to-date information.

3D Model Management

View 3D models, review each project discipline individually, and track model versions in a controlled manner.

BIM-Based Quantity Takeoff and Cost Management

Analyze quantity takeoffs extracted from model elements and link the quantities to budget, unit price, and cost data.

BIM-Based Site and Progress Management

Track completed work, site records, tasks, and progress data through model elements.

4D Schedule Simulation

Link model elements to schedule activities to simulate the construction process over time.

5D Cost Simulation

Integrate model, schedule, and cost data to analyze how project costs change over time.

Predefined Workflows for Each Module

Rather than viewing the entire platform as a single workflow, explore how each module works through its own distinct steps.

BIM Management

3D Model Management

Bring models from all project disciplines together in a single environment and track their versions in a controlled manner.

01

Upload Models to the System

Upload 3D models from various disciplines, such as architectural, structural, and mechanical engineering.

Upload Models to the System
02

Review the Model Structure

Filter by floor, location, discipline, class, and model element to view project details.

Review the Model Structure
03

Track Model Versions

Upload new model versions to the system and compare changes with previous versions.

Track Model Versions
04

Link to Project Data

Link model elements to the project schedule, budget, contracts, construction activities, and site records.

Link to Project Data
05

Publish the Latest Model

Make the reviewed model version available to the relevant project teams.

Publish the Latest Model
01

Classify Model Elements

Group model elements for quantity takeoff by discipline, category, floor, location, or type of work.

Classify Model Elements
02

Generate Quantity Takeoff Data

Automatically calculate the quantity, length, area, and volume of model elements.

Generate Quantity Takeoff Data
03

Map to BOQ Items

Link model elements to BOQ, budget, or contract items.

Map to BOQ Items
04

Define Unit Prices

Link model elements to BOQ, budget, or contract items.

Define Unit Prices
01

Define Construction Work Areas

Link the construction activities to be tracked on site with model elements, floors, locations, or work zones.

Define Construction Work Areas
02

Create Site Records

Create construction work, inspection, nonconformance, task, and progress records directly from the relevant model element.

Create Site Records
03

Record Actual Progress

Enter completed work quantities, progress percentages, and site status information into the system.

Record Actual Progress
04

Follow Along Using the Model

Display production items that have not started, are in progress, have been completed, or have issues using colors on the model.

Follow Along Using the Model
01

Import the Project Schedule into the System

Upload the latest project schedule to the system or integrate it with existing planning data.

Import the Project Schedule into the System
02

Link Activities to the Model

Link schedule activities to the relevant model elements, construction activities, and work areas.

Link Activities to the Model
03

Visualize the Construction Sequence

Simulate the project’s planned construction process over time using the model.

Visualize the Construction Sequence
04

Compare Planned and Actual Progress

Compare planned progress with current on-site progress using the same model.

Compare Planned and Actual Progress
05

Analyze Delays

Identify delayed, early-completed, or critical construction activities and take the necessary action.

Analyze Delays
01

Link Cost Data to the Model

Link model elements to budget, quantity estimate, contract, and cost items.

02

Integrate Time and Cost Data

Determine when costs associated with schedule activities will be incurred.

03

Simulate Cost Flow

View the project’s planned cost progression over time.

04

Track Actual Costs

Analyze actual costs using progress payment, contract, and site progress data.

05

Manage Variances and Forecasts

Compare planned and actual costs, and generate up-to-date forecasts for the project’s cost at completion.

Manage Your Processes Your Processes End to End with BUILD IT

Integrate your design processes with BUILD IT’s other solution areas and manage project data seamlessly from design through on-site execution.